Main Structure
Frame

Assembled with 8MF cold‑bent steel sections, using a welding‑free structure. 20mm modular holes for flexible component mounting.

Busbar System

ZM‑type busbar clamps made of high flame‑retardant PPO material, providing high mechanical strength and insulation. Withstands peak current up to 73.5kA.

Functional Compartments

Independent compartments for main bus, distribution bus, and outgoing circuits – preventing fault propagation and ensuring safety.

Protection Rating

Available in IP20 to IP54. The cabinet top is equipped with a pressure relief device for arc fault protection.

Key Features
  • Flexible installation options: available in fixed or plug-in versions to suit different application needs.
  • Protection rating: IP20 to IP54, adaptable to various environmental conditi
  • Wide breaker compatibility: configurable with a range of circuit breakers from major brands for design flexibility.
Classification of Moldvolt Switchgear Drawer
BLOKSET Cabinet 4M/2

Two outgoing circuits — ideal for small-scale sub-distribution.

Compact design optimizes space while maintaining reliable performance.

BLOKSET Cabinet 3M-100A~250A

Supports motor control and lighting distribution applications.

Flexible configuration adapts to a wide range of load requirements.

BLOKSET Cabinet 6M-400A-630A

Designed for main distribution and high-load circuits.

Robust construction ensures stable operation under demanding conditions.

Technical Specifications
Wideth(W) Depth(D) Height(H)
600 600/800/1000 2200
800 600/800/1000 2200
1000 600/800/1000 2200
1200 800/1000 2200
Our Capabilities
We designed M‑Blokset for fast deployment and low total cost – now we help you do the same in your own factory.
Ready‑to‑Use Production Kit
Ready‑to‑Use Production Kit
You don't need a full engineering team. We provide a streamlined document package – simplified GA drawings, pre‑selected BOM, basic wiring diagrams, and a fast‑start assembly guide – to get your line running in weeks, not months.
Pre‑Engineered Unit Combinations
Pre‑Engineered Unit Combinations
Choose from our standard M‑Blokset unit configurations (4M/2, 3M, 6M) – each comes with a matched component kit (rails, interlock, terminals, labeling). No custom engineering needed for common applications.
Cost‑Conscious Component Options
Cost‑Conscious Component Options
We offer two‑tier quality options for many accessory lines (standard vs. economy) – both fully tested but priced for different project budgets. You decide where to save and where to invest.
Lean Production Support
Lean Production Support
We help you set up a lean assembly line for M‑Blokset: workstation layout, material flow, basic tooling, and daily output targets. You can start with small batches and scale as orders grow – without heavy upfront investment.
Our Success Stories
XHONELE Enables Egyptian Client's Transformation
We provided a complete MOLDVOLT drawer cabinet upgrade solution for our Egyptian client. Through custom drawings, core components, and round-the-clock technical support, we helped them achieve a successful transformation—boosting profits by 40% and rapidly becoming a regional market leader.
Stuck In Low-Price
Competition With Fixed Cabinets
Shortage
Of Professional Technical Workers
Our Success Stories
XHONELE Enables Indonesian Client's Market Upgrade
We provided a complete low-voltage drawer cabinet upgrade solution for our client in Indonesia. Through proven design drawings, all core component kits, and specialized technical training, we helped them achieve a successful product line transformation — increasing product margins by 35% and entering the high-end project market within 4 months.
Stuck In Low-Margin
Competition With Fixed Cabinets
Shortage Of Expertise
In Drawer Cabinet Design And Supply Chain
Our Success Stories
XHONELE Enables South African Distributor's Cost Transformation
We provided a core component kit (CKD) solution to a South African electrical distributor. By supplying all precision parts like interlocks and plugs for local assembly, we helped them slash total costs by 40% and cut lead times from 3 months to 5 weeks, sharply boosting their project bidding competitiveness.
High Logistics Cost
Accounting for 25% of total expenses for complete cabinet imports
Long Lead Times
3-month delivery windows hindering project timelines
Blog & Insights

GET A QUOTE

13634205622

+86 13634205622

[email protected]

GET IN TOUCH NOW
Captcha Code